• MuttMutt@lemmy.world
    link
    fedilink
    English
    arrow-up
    32
    ·
    10 hours ago

    I replaced an entire roof myself. Tore off 4 layers of roofing, fixed the rotten 1x4 slats that the cedar shake roof was on, sheathed the roof deck, applied the underlayment, and shingled the roof.

    All the old roofing went out in three trash cans that were fully loaded every week. One was ours, the other two were neighbors cans who are generally gone and used with their permission.

    There are a few other houses in town where they have been trying to DIY their roof as well. They are not doing so well…

    • grue@lemmy.world
      link
      fedilink
      arrow-up
      4
      ·
      6 hours ago

      I’m terrified of trying to DIY that. Not because I would do it wrong, but because I’m the kind of guy who has a bunch of half-finished projects and that would be disastrous to happen to my roof.

      • MuttMutt@lemmy.world
        link
        fedilink
        English
        arrow-up
        2
        ·
        2 hours ago

        You just gotta keep coming back around to the project till it’s finished. I have multiple going and weather, injuries, and time sometimes get in the way. I’m not a roof person (i keep 3 points of contact at all times) and did it in sections by doing a 20X25 foot tear off, pull nails, repair, sheathing, underlay, and shingle.

        It’s not easy but the alternative is paying someone more than I like. My house is approximately 50X30 feet with an 8/12 pitch roof. Approximately 22 square in size. My cost was about 6k total with the sheathing I probably would have been charged 25 to 30K by a company.

    • TrackenDaKracken@lemmy.world
      link
      fedilink
      arrow-up
      14
      ·
      10 hours ago

      Congratulations, that’s a big job.

      I considered it, but knew it would take me a month and I might really hurt myself. Maybe if I were younger and had friends to help.

      • MuttMutt@lemmy.world
        link
        fedilink
        English
        arrow-up
        6
        ·
        edit-2
        2 hours ago

        I had one person as ground help. Got smart and stuck him in the upstairs to pass shingles through the gaps in the slats before I covered them instead of trying to carry them on the ladder.

        I’m going to tear the rotten back porch off the house at some point and rebuild it completely. The roof was built at too shallow of an angle and it is rotten, same for some spots in the floor. It was originally an exposed porch that was covered and walled in. So many issues… Eventually will be replacing the rubblestone foundation as it’s falling apart, may put in a basement while I’m at it.