      For reference, that bridge in Baltimore that was knocked out in 2024 is scheduled to reopen in the “late 2030s.” Nothing happens fast with big bridges. Especially if the massive, expensive, specialized construction barges and cranes doing the work are under threat of getting exploded like the bridge.

      • prettybunnys@piefed.social
        link
        fedilink
        English
        arrow-up
        15
        ·
        edit-2
        23 hours ago

        That’s not entirely comparable.

        The waterway was reopened in under a month and the reason a new bridge isn’t being IMMEDIETELY put in is because it hasn’t completely blocked all access.

        There are other routes.

        If there was a war going on and this bridge was the only primary access by land to Baltimore and a hypothetical “only warm water port” I’d wager the bridge would be under repairs basically immediately.

        However also attacked again, basically immedietely.

        Also HUGE thing to correct on: the replacement bridge should reopen in late 2030, not the late 2030s

        Another big thing to compare: the USA and other more developed / smarter countries woulda built a tunnel so blowing a bridge wouldn’t block the waterway.

        See: the Chesapeake bay bridge tunnel which was built to not block Norfolk Naval

        Also get a navy sailor drunk and ask em about Puget Sound

        • socsa@piefed.social
          link
          fedilink
          English
          arrow-up
          2
          arrow-down
          1
          ·
          13 hours ago

          Tha rest of the Baltimore bridge was also crazy outdated and insufficient and needed to be completely replaced anyway.

          • prettybunnys@piefed.social
            link
            fedilink
            English
            arrow-up
            1
            ·
            12 hours ago

            What do you mean “insufficient”

            It’s gonna basically be built the same, modern and a different design, but still a 2 lane in either direction in generally the same spot … just to updated federal standards for shoulders and lane size and whatnot.

        • Simulation6@sopuli.xyz
          link
          fedilink
          English
          arrow-up
          2
          arrow-down
          1
          ·
          14 hours ago

          Not sure they even have the funding worked out to replace the Key bridge in Baltimore. That 2030 date is definitely in jeopardy.

          • farmgineer@nord.pub
            link
            fedilink
            English
            arrow-up
            2
            ·
            11 hours ago

            You can’t just declare “I am slow” like that. Did you have at least 3 meetings where you talked in circles with your team, then repeated that again with levels of management above to fill in the permit to have more meetings?!