SSTF@lemmy.world to pics@lemmy.world · 6 days agoComputer wiring tunnel, abandoned coal power plant. Photo by Bryan Buckley.lemmy.worldimagemessage-square43linkfedilinkarrow-up1557arrow-down11
arrow-up1556arrow-down1imageComputer wiring tunnel, abandoned coal power plant. Photo by Bryan Buckley.lemmy.worldSSTF@lemmy.world to pics@lemmy.world · 6 days agomessage-square43linkfedilink
minus-squareSirActionSack@aussie.zonelinkfedilinkEnglisharrow-up1·5 days agoYeah modern stuff still has lots of wires. An automated valve may have 4 or 5 wires - open command, open feedback, closed feedback and 0V. A switch to show something is open or closed will have two wires. You can put a lot of that stuff on a fieldbus but that is often trading lower install costs for higher ongoing costs and more downtime.
Yeah modern stuff still has lots of wires. An automated valve may have 4 or 5 wires - open command, open feedback, closed feedback and 0V.
A switch to show something is open or closed will have two wires.
You can put a lot of that stuff on a fieldbus but that is often trading lower install costs for higher ongoing costs and more downtime.